Back to Projects
ElectricalHydraulicFire Protection

47 Holbeche Road, Arndell Park

Arndell Park, NSW
47 Holbeche Road, Arndell Park
Client
Beverage manufacturer
Sector
Food and Beverage Industrial Fitout
Location
Arndell Park, NSW
Completion
2026
Project Value
$600,000 (est.)
Design Duration
3 weeks

Project Snapshot

A beverage manufacturer fitted out food production rooms inside an existing Class 8 factory. The works covered bottling, batching, warehouse and loading areas under a Complying Development Certificate.

CCC Engineering delivered hydraulic, electrical and fire protection design. Construction issue drawings were issued in May 2026, followed by a fire services endorsement.

The governing issue was the existing fire hose reels, installed to an older Ordinance 70 specification. A coverage check showed they still meet current coverage, so an endorsed objection avoided a hose reel upgrade.

Our Role

  • Backflow protection with two reduced pressure zone devices (AS/NZS 3500.1:2021)
  • Cold and hot water reticulation with an 18 kW instantaneous electric water heater
  • Pump-out sanitary drainage for new production sinks
  • Exit and emergency lighting layout to NCC 2022 Part E4
  • Fire extinguisher layouts (AS 2444-2001)
  • Fire hose reel coverage checks on every level (AS 2441-2005)
  • Fire services endorsement by an accredited practitioner

Challenges & Solutions

Challenge

Existing fire hose reels were installed to an older Ordinance 70 specification.

Solution

Checked coverage on every level and secured an endorsed objection, so no reel upgrade was needed.

Challenge

Wet production areas needed the potable water supply protected from contamination.

Solution

Specified two reduced pressure zone devices to protect the building water supply.

Challenge

Production rooms were fitted into an existing factory with services already in place.

Solution

Connected new water services to the existing copper supply and pumped sink waste to sewer.

Results

  • Hydraulic, electrical and fire drawings issued for construction in May 2026
  • Fire services endorsement confirmed existing systems need no modification
  • CDC documentation covered bottling, batching, warehouse and loading areas
  • Design delivered within a three week program
  • Services connected into the existing factory supply and drainage