Project Snapshot

Anjuman-e-Burhani Mosque Trust engaged CCC Engineering to deliver the mechanical design for a new two-storey community and education centre in Auburn. The project involved the redevelopment of an existing brown-fill site into a purpose-built facility featuring classrooms, a commercial kitchen, staff amenities, and accommodation for on-site cooks. The design brief required a cost-effective and compliant solution to support Development Application and Construction Certificate approvals while ensuring comfort, ventilation, and energy efficiency for a diverse range of building uses.

Our Role

  • Mechanical services design for DA and CC documentation
  • Ventilation and air conditioning system layouts
  • Heat load calculations and equipment selection
  • Design certification to NCC 2022 and AS 1668.1/2
  • Coordination with architectural, fire, and BCA consultants
  • Budget estimates and specification documentation
  • Site inspections and witness testing during construction

Challenges & Solutions

Challenge

Integrating multiple mechanical systems in a compact, multi-use building

Solution

Developed coordinated ducted layouts and efficient plant zoning to optimise ceiling and plant space.

Challenge

Achieving acoustic and thermal comfort within teaching and kitchen areas

Solution

Applied targeted ventilation strategies and insulated ductwork to maintain comfort across variable loads.

Results

  • Achieved a compliant, energy-efficient mechanical design for DA and CC approval
  • Simplified coordination between disciplines through detailed layouts
  • Delivered high indoor comfort and ventilation standards across varied zones
  • Enabled smooth construction with clear design intent and equipment scheduling
  • Supported client objectives through responsive communication and fast turnaround
  • CLIENT FEEDBACK (Anonymous)
  • “CCC Engineering were quick and proactive, completed the work on time and were always there to
  • answer queries and discuss the best outcome for the project. I would definitely work with them
  • again.” - Client

Client Testimonial

★★★★★

"CCC Engineering were quick and proactive, completed the work on time and were always there to answer queries and discuss the best outcome for the project. I would definitely work with them again."

Verified Client

Have a similar project?

We deliver fast, compliant, multi-discipline building services engineering. Let's talk about your project.