Mechanical

Anytime Fitness, Castle Hill

2 Mandala Parade, Castle Hill NSW
Anytime Fitness, Castle Hill
Client
Fitzgerald Air Conditioning (for Anytime Fitness)
Sector
Mechanical Services Design – Retail Fitness Fitout
Location
2 Mandala Parade, Castle Hill NSW
Completion
2025
Project Value
$250,000 (Mechanical Works)
Design Duration
8 weeks (estimated)

Project Snapshot

Anytime Fitness engaged CCC Engineering to design a compliant mechanical ventilation system for their new fitness club at Castle Hill. The project formed part of a broader fitout within a newly built mixed-use retail and residential development. CCC Engineering’s scope focused on designing a dedicated ventilation system that met all NCC 2022 and AS 1668.2 requirements, ensuring safe, efficient, and reliable ventilation for the facility’s amenities. The design was developed in coordination with the builder and mechanical contractor to integrate seamlessly within tight spatial and construction constraints.

Our Role

  • Review of architectural and structural layouts to assess site conditions
  • Detailed design of toilet exhaust ventilation system
  • Fan, grille, and ductwork sizing and equipment scheduling
  • Compliance certification to NCC 2022 F6D6, F6D10, and AS 1668.2:2012
  • Delivery of tender-ready design drawings and specifications

Challenges & Solutions

Challenge

Limited ceiling space within amenities area

Solution

Compact duct routing and low-profile fan selection to maintain required airflow without structural impact

Challenge

Integration within mixed-use development

Solution

Careful coordination to isolate exhaust discharge and avoid cross-contamination with residential systems

Challenge

Tight delivery timeframe

Solution

Streamlined single-stage design process and efficient client communication enabling completion within one week of engagement

Results

  • Fully compliant ventilation design certified to NCC 2022 and AS 1668.2
  • Smooth construction integration with zero design-related variations
  • Optimised airflow achieving effective odour control and occupant comfort
  • Rapid turnaround supporting the client’s fast-tracked construction program
  • Delivered with professional accuracy and cost efficiency

Client Testimonial

★★★★★

"CCC Engineering go above and beyond making the whole process stress free."

Fitzgerald Air

Have a similar project?

We deliver fast, compliant, multi-discipline building services engineering. Let's talk about your project.