Back to Projects
Mechanical

Atomic Spin Laundromat, Erskineville

Erskineville NSW
Atomic Spin Laundromat, Erskineville
Client
Atomic Spin Laundromat
Sector
Mechanical Services Engineering – Ventilation & Dryer Exhaust
Location
Erskineville NSW
Completion
2025
Project Value
Approx. $15,000 (Mechanical Works Estimate)
Design Duration
6–8 weeks (fitout typical)

Project Snapshot

Atomic Spin Laundromat engaged CCC Engineering to deliver mechanical services design for a new retail laundromat fitout within an existing mixed-use development in Erskineville. Located within a Class 6 retail tenancy forming part of a broader Class 2 and 7b building, the project required carefully coordinated ventilation and dryer exhaust systems to achieve regulatory compliance and operational performance. The primary objective was to obtain a Complying Development Certificate (CDC) while delivering a practical, cost-effective solution suited to a high-moisture, high-heat environment.

Our Role

  • CCC Engineering delivered a staged electrical design service including:
  • Review of architectural and structural documentation
  • Design of outside air ventilation systems
  • Design of commercial dryer exhaust systems
  • Equipment selection and plant scheduling
  • Mechanical layouts and ventilation schematics
  • Scope of Works documentation for tender
  • Liaison with BCA consultant
  • Design certification to NCC 2022 and AS 1668

Challenges & Solutions

Challenge

High heat and moisture loads from commercial dryers

Solution

Designed dedicated dryer exhaust systems with compliant discharge and adequate make-up air provisions

Challenge

Integration within existing mixed-use building

Solution

Coordinated plant space and duct routes to suit tenancy constraints and base build conditions

Challenge

Achieving CDC approval within tight timeframe

Solution

Delivered compliant documentation and design certification within one week of engagement

Results

  • Achieved CDC-ready mechanical documentation
  • Fully compliant design to NCC 2022 Clauses C4D15, F6D6, F8D4, F8D5 & J6
  • Compliance with AS 1668.1–2015 and AS 1668.2–2012
  • Efficient ventilation strategy suited to continuous laundromat operation
  • Clear, buildable documentation enabling streamlined contractor pricing

Client Testimonial

★★★★★

"CCC were able to deliver a quick and effective solution when our job came to a stand still due to Mechanical design issues."

Mohammed Alrefaei
Blue Pearl Constructions

Have a similar project?

We deliver fast, compliant, multi-discipline building services engineering. Let's talk about your project.