Back to Projects
Mechanical

Dell Technologies, Chatswood

Chatswood NSW
Dell Technologies, Chatswood
Client
Sydney Mechanical Contractor
Sector
Mechanical Services Design – Minor Office Fitout
Location
Chatswood NSW
Completion
2025
Project Value
$10,000 (Mechanical Works est.)
Design Duration
6 Weeks (Approx.)

Project Snapshot

CCC Engineering was engaged to deliver the mechanical services design for a small office fitout within Level 3 of Dell’s Chatswood premises. The project involved the refurbishment of an existing tenancy (NCC Class 5) to create a functional retreat and workspace environment. Working within an operational commercial building, the design required seamless integration with base-building systems while ensuring full compliance with NCC 2022 and relevant Australian Standards. The outcome was a practical, compliant, and efficiently delivered mechanical solution tailored to a compact office footprint.

Our Role

  • CCC Engineering delivered a staged electrical design service including:
  • Review of existing base-build services and constraints
  • Mechanical services layout and detailed documentation (Drawing M100)
  • Design of air handling and ventilation systems
  • Specification of ductwork, insulation, and equipment selections
  • Compliance certification to NCC 2022 and AS 1668.1/2
  • Coordination support with mechanical contractor
  • Issued-for-construction and as-built documentation

Challenges & Solutions

Challenge

Limited ceiling space within an existing commercial tenancy

Solution

Designed compact duct routes and low-pressure sheet metal systems to suit constrained ceiling voids

Challenge

Integration with retained base-build systems

Solution

Careful review and coordination to ensure new works aligned with existing infrastructure

Challenge

Achieving NCC 2022 and Section J compliance

Solution

Designed systems in accordance with AS 1668.1 & 1668.2 and provided formal Mechanical Services Design Certification

Results

  • Smooth approval process supported by clear, compliant documentation
  • Efficient mechanical layout minimising disruption to existing services
  • Reliable indoor comfort for staff and occupants
  • Delivered within a short design programme (2 weeks)
  • Construction completed efficiently over approximately 6 weeks

Client Testimonial

★★★★★

"Quick turn around, friendly attitude."

Verified Client
Sydney Mechanical Contractor

Have a similar project?

We deliver fast, compliant, multi-discipline building services engineering. Let's talk about your project.