Microbrewery, Greta

Greta, NSW
Microbrewery, Greta
Client
Timothy Burt
Sector
Mechanical & Hydraulic Engineering Design
Location
Greta, NSW
Completion
2026
Project Value
Approx. $200,000 (Services Works Est.)
Design Duration
Approx. 8–10 Weeks

Project Snapshot

CCC Engineering was engaged to deliver building services engineering for a new on-site distillery facility in Greta, NSW. Following Development Approval from Cessnock City Council, the project required detailed mechanical and hydraulic documentation to support Construction Certificate approval and demonstrate compliance with key statutory conditions, including stormwater discharge, mechanical exhaust, water utility requirements, and bushfire protection. The scope focused on delivering practical, compliant solutions tailored to a purpose-built production shed, ensuring operational efficiency and regulatory certainty.

Our Role

  • CCC Engineering delivered a single-stage detailed design including:
  • Review of architectural and structural documentation
  • Mechanical ventilation design (outside air, natural ventilation, toilet exhaust)
  • Hydraulic design including sanitary drainage, trade waste, and domestic water services
  • Detailed layouts, equipment schedules, and scope of works documentation
  • High-level budget estimates and tender documentation
  • Design certification to NCC 2022 and relevant Australian Standards

Challenges & Solutions

Challenge

Compliance with multiple DA conditions

Solution

Integrated mechanical and hydraulic documentation addressing council requirements for exhaust, stormwater, and utility services.

Challenge

Industrial process requirements within a small- scale facility

Solution

Designed efficient ventilation and trade waste systems suited to distillery operations while maintaining cost control.

Challenge

Fast-tracked approval timeframe

Solution

Delivered full detailed design and certification within a two-week program .

Results

  • Achieved compliance with NCC 2022 and AS 1668.1/2 for ventilation
  • Hydraulic systems designed in accordance with NCC Volume 3 and AS 3500