Project Snapshot
CCC Engineering delivered a comprehensive mechanical services solution for PepsiCo’s corporate tenancy across Levels 10 and 11 at 177 Pacific Highway, North Sydney. The project involved a high-density commercial office layout incorporating open-plan workstations, enclosed meeting rooms, breakout spaces, utility areas, and collaboration zones. The fitout required precise zoning control, balanced fresh air delivery, and seamless integration into the building’s base condenser water infrastructure. The design utilised multiple packaged air conditioning (PAC) units connected to tenant supplementary condenser water services. Air distribution was delivered via a Variable Air Volume (VAV) strategy across both floors, enabling granular environmental control while maintaining compliance with ventilation and energy efficiency requirements. Careful coordination was required due to: • Dense ceiling service zones • Multiple VAV branches • Integrated outside air systems (OAF units) • Fire and isolation damper coordination • Supplementary condenser water riser integration
Our Role
- CCC Engineering delivered a staged electrical design service including:
- Fire Engineering Report review, coordination and mechanical approval.
- Design responsibility including final Statement
- Preparation of Shop Drawings and As Builts
- Equipment schedules, details, schematics, single-line diagrams specified.
- All pipe, conduit, tray, catenary and duct route layouts.
- Coordinated and dimensioned drawing for each level of the building detailing all required
- penetrations and setout drawings for plinths and other traditional “builders” works.
- Coordination information giving detailed information regarding works specified in other
- sections of the project specification.
- penetrations for all services with the relevant input from the services specified herein.
Challenges & Solutions
Challenge
Fire and shutdown integration
Solution
Inclusion of motorised volume control dampers and fire dampers for the revised compartmentation
Challenge
High-density office layout requiring zoning precision
Solution
Implemented multiple VAV terminals per floor (VAV-L10 & VAV- L11 series) to provide zone-level temperature modulation
Challenge
Fire rated communications room
Solution
PAC units located externally to comms rooms with fire dampers in supply and return air ductwork
Results
- Zoned temperature control across high-density office floors
- Seamless integration with base building condenser water system
- Controlled outside air delivery for occupant wellbeing
- Reduced acoustic transmission through anti-vibration detailing
- Clear construction-ready documentation for contractor delivery
- Fire and damper scheduling fully coordinated
- Maintainable distributed plant arrangement
- Flexible system capable of future tenancy reconfiguration
Client Testimonial
"Quick turn around, friendly attitude."